Bid or no bid? A 10-question checklist before you answer a public tender
Writing a tender response takes days. Use these ten questions to decide quickly which public tenders are worth it, and to stop spending time on bids you cannot win.
By the Tenderio team · · 4 min read
A good public tender response takes days of work from several people. Companies that win often are not the ones that bid on everything: they bid on fewer tenders, chosen well, and put real effort into each.
The tool for that is a bid/no-bid decision (also called go/no-go), made early and honestly. Here are the ten questions we use, and how to score them.
Why decide early
Most tenders give you four to six weeks, and the first week is the cheapest moment to walk away. After that you have spent time reading documents, asking partners and drafting. Make the decision within two or three working days of finding the tender, and revisit it only if something important changes, such as an amendment to the requirements.
The 10 questions
1. Can we deliver all of it?
Read the scope and the technical specifications, not just the title. If the contract is split into lots, check each lot separately. If you can deliver only part of the work, you need a partner or subcontractor, and you need them before you write.
2. Do we meet every mandatory requirement?
Mandatory requirements are pass or fail: minimum turnover, years of experience, number of similar past contracts, certifications such as ISO 9001 or ISO 27001, security clearances, insurance levels, registrations. One missing item means rejection, however good the rest is. In the US, this includes an active SAM.gov registration and eligibility for any set-aside.
3. Can we prove it?
Meeting a requirement is not enough; you need the evidence. Reference letters, contract values, CVs of named experts, certificates that are still valid on the submission date. If the proof takes weeks to collect, count that in.
4. Do we know the buyer?
Have you worked with this buyer, met them, or answered their earlier market research? A buyer who has never heard of you is not a reason to stop, but tenders where you have a relationship convert much better.
5. Is there an incumbent?
Check award history on TED or USAspending.gov. If the same company has held the contract for years and the requirements look written around their solution, your chances are lower. If the incumbent performed badly, or the work is new, they are higher.
6. How is the tender evaluated?
Lowest price only, or price combined with quality? Look at the weightings. If quality counts for 60 % and you are strong on the technical approach, that is your opportunity. If price is everything and you are not the cheapest provider, think twice.
7. Is the price realistic for us?
Compare the estimated value, if published, with your costs. Look at the prices of similar past awards. A contract you win at a loss is worse than one you do not win.
8. Do we have the time and people?
Who will write, who will price, who will review and sign? Check the submission deadline against holidays and other bids. A rushed bid is usually a losing bid.
9. Are the contract terms acceptable?
Read the draft contract: liability caps, penalties, payment terms, guarantees (bid bonds, performance guarantees), intellectual property, data location. Some terms are dealbreakers no matter how attractive the work is.
10. Does it fit our strategy?
Even a hard bid can be worth it if it opens a new sector, country or buyer. Write down the strategic reason, so the decision does not depend on enthusiasm alone.
How to score it
Give each question a score from 0 to 2:
- 0: no, or a serious problem.
- 1: partly, or uncertain.
- 2: yes, clearly.
Questions 1, 2 and 9 are gates: a 0 on any of them means no bid, whatever the total. For the rest, a total of 14 or more out of 20 is a strong bid, 10 to 13 needs a conversation, and below 10 is usually a no bid.
Keep the scores. After a few months you can compare them with your results, and you will learn which questions really predict wins for your company.
Make no-bid a normal answer
Teams often feel that not bidding is a failure. It is the opposite: every tender you decline gives more time to the ones you can win. If you do decline, consider telling the buyer why, briefly and politely. It builds the relationship, and buyers sometimes change requirements that excluded good suppliers.
How Tenderio helps
When you open a tender in Tenderio, the AI reads all the documents and gives you a verdict with the reasons: which requirements you meet from your company profile and documents, which are partly met or missing, the risks, the key dates and the prices of similar past contracts. That turns most of this checklist into a ten-minute review. Try it free on one tender.